
Route-128 in Needham at takeoff.
All chopper approaches to the ch-5 studios must be to and from the south.

Approaching downtown Boston from the south.
This day, one of the Big Dig tunnels had a leak which caused the traffic
jam at bottom center.
The chopper was sent to investigate after photographers on the ground
tried but failed to approach the vicinity... due to the traffic jam.

Just doing our job... looking at Lewis Wharf, Long
Wharf & Columbus Park.

Old Charlestown Navy Yard with Everett and Revere to the far North

Looking west.

Directly above the Fleet Center revealing the chin
turret camera and lights.


100 Federal Street (for RADIO-1 base station)

One Financial Place for RADIO-5 news dispatching and the live CityCam
camera

One Boston Place for a primary newsgathering microwave receive site.

One Beacon Street (RADIO-3 IFB transmitter)

Almost home...



Another safe flight for ch-5 news photographer Zip Bradwell.

With new microwave gear and a fresh 100hr aircraft
inspection,
flight
photographer Steve Colvin is off to the next news
assignment...
|